Ready to go? Add this product to your cart and select a plan during checkout. Payment plans are offered through our trusted finance partners Klarna, PayTomorrow, Affirm, Afterpay, Apple Pay, and PayPal. No-credit-needed leasing options through Acima may also be available at checkout.
Learn more about financing & leasing here.
30-day refund/replacement
To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.
To initiate a return, please visit our Returns Center.
View our full returns policy here.
Style: [B] 5mm Constant Light
Color: [22] Rgb Tri-color (Common Cathode) / 100pcs
Features
Description
Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".
Brand: EDGELEC
Light Type: LED
Special Feature: Instant On
Bulb Shape Size: B10
Bulb Base: E26
Is Discontinued By Manufacturer : No
Product Dimensions : 0.21 x 0.2 x 1.4 inches; 0.01 ounces
Item model number : ED_YT05_RGB-4P-C
Date First Available : December 4, 2017
Manufacturer : EDGELEC
Customer Reviews: 4.7 4.7 out of 5 stars 2,166 ratings
Brand: EDGELEC
Light Type: LED
Special Feature: Instant On
Bulb Shape Size: B10
Bulb Base: E26
Specific Uses For Product: General purpose
Light Color: Red, Green
Voltage: 3 Volts
Unit Count: 100 Count
Number of Items: 100
Shape: 5mm Round Top
Material: Metal
Connectivity Technology: Normal bulb
Controller Type: Push Button
Included Components: 100 pcs LED Diodes, 300 pcs Resistors, 200pcs 430ohm Resistors, 100pcs 470ohm Resistors
Beam Angle: 30 Degrees
Item Package Quantity: 100
Light Source Type: LED
Item Weight: 380 Milligrams
Light Source Wattage: 0.06 Watts
Control Method: Touch
Manufacturer: EDGELEC
UPC: 611355168316
Part Number: ED_YT05_RGB-4P-C
Product Dimensions: 0.21 x 0.2 x 1.4 inches
Item model number: ED_YT05_RGB-4P-C
Is Discontinued By Manufacturer: No
Assembled Height: 35.5 millimeters
Assembled Length: 5.3 millimeters
Assembled Width: 5 millimeters
Style: [B] 5mm Constant Light
Color: [22] Rgb Tri-color (Common Cathode) / 100pcs
Finish types: Clear
Special Features: Instant On
Batteries Included?: No
Batteries Required?: No
Wattage: 0.06 Watts
Date First Available: December 4, 2017