Search  for anything...

EDGELEC 100pcs 3mm Green Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 3V Light Emitting Diode Lamp Bulb +100pcs Resistors (430ohm for DC 6-12V) Included

  • Based on 1,506 reviews
Condition: New
Checking for the best price...

Buy Now, Pay Later


As low as $2 / mo
  • – 4-month term
  • – No impact on credit
  • – Instant approval decision
  • – Secure and straightforward checkout

Ready to go? Add this product to your cart and select a plan during checkout.

Payment plans are offered through our trusted finance partners Klarna, Affirm, Afterpay, Apple Pay, and PayTomorrow. No-credit-needed leasing options through Acima may also be available at checkout.

Learn more about financing & leasing here.

Selected Option

Free shipping on this product

This item is eligible for return within 30 days of receipt

To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.

To initiate a return, please visit our Returns Center.

View our full returns policy here.


Availability: Only 7 left in stock, order soon!
Fulfilled by Amazon

Arrives Tuesday, Feb 10
Order within 49 minutes
Available payment plans shown during checkout

Protection Plan Protect Your Purchase
Checking for protection plans...

Style: [E] 3mm Flickering Light


Color: [07] Green / 100pcs


Features

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: Green Lights Flickering / 3mm Round Clear Lens / 29mm Long Lead
  • Product Parameters: Candle Lights Keep Flickering / DC 3.0V-3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 520nm-525nm / 30 Viewing Angle / Single LED Diodes Wight: 0.16g
  • Accessories: 100pcs 430ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance

Description

Style:[E] 3mm Flickering Light | Color:[07] Green / 100pcs Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".


Brand: ‎EDGELEC


Manufacturer: ‎EDGELEC


Part Number: ‎ED_YT03_FLK-G


Product Dimensions: ‎0.13 x 0.12 x 1.3 inches


Is Discontinued By Manufacturer: ‎No


Assembled Height: ‎33 millimeters


Assembled Length: ‎3.2 millimeters


Assembled Width: ‎3 millimeters


Style: ‎[E] 3mm Flickering Light


Color: ‎[07] Green / 100pcs


Shape: ‎3mm Round Top


Included Components: ‎Resistors Incuded (For DC 6-12V)


Voltage: ‎3 Volts


Specific Uses: ‎General purpose


Special Features: ‎Flicker LED (Candle Flickering Lights)


Batteries Included?: ‎No


Batteries Required?: ‎No


Type of Bulb: ‎LED


Date First Available: December 4, 2017


Frequently asked questions

If you place your order now, the estimated arrival date for this product is: Tuesday, Feb 10

Yes, absolutely! You may return this product for a full refund within 30 days of receiving it.

To initiate a return, please visit our Returns Center.

View our full returns policy here.

  • Klarna Financing
  • Affirm Pay in 4
  • Affirm Financing
  • Afterpay Financing
  • PayTomorrow Financing
  • Financing through Apple Pay
Leasing options through Acima may also be available during checkout.

Learn more about financing & leasing here.

Top Amazon Reviews


  • Great for Halloween Jack-O-Lanterns
Style: [F] 5mm Flickering Light Color: [06] Yellow / 100pcs
I used these to make flickering lights for my plastic jack-o-lanterns. Use one of these in series with 3 plain yellow LEDs and a suitable resistor. The plain LEDs will flicker synced to this one and the brightness is 4X. :-)
Reviewed in the United States on December 6, 2018 by S. Marum

  • Great Deal!
Style: [B] 5mm Constant Light Color: [11] Purple (Uv) / 100pcs
I remember buying 2 uv LED for $5 @ radioshack when they still existed around here, so you aren't going to get a complaint from me about these, but i digress. didn't count them cuz there was a freaking lot of them, didn't doubt it was 100 pc, but even if it were 20 short still not complaining, i was just trying to get a couple for a couple buck anyway. -the leads really are longer, i was slightly impressed to see truth to that (mind you they are thinner than some, not complaining) -they are actually UV, made a pack of highlighter look like some wild glowsticks -100resistors?!?! i was going to buy the LEDs any way, but this got me to buy from them as opposed to other sellers -packed well enough for LEDs, anti-stack pouches, labeled 3.3v UV and .25 watt, 430ohm respectively (otherwise i'll throw them in a bead bag from the crafts aisle, forget what they are and have to test them or look them up) thoroughly satisfied with this purchase, don't think i'll need more for a long time, but i'll happily order another color from this seller ... show more
Reviewed in the United States on August 7, 2019 by Nadean Gutierrez

  • Great for illuminating 3D printed items
Style: [F] 5mm Flickering Light Color: [06] Yellow / 100pcs
I 3D print terrain for tabletop games. One of the objects is a wall-segment with a wall=mounted torch. I used these with that wall to create the torchlight effect. Pros: Price is excellent for 100 pcs. Lead material is very bendable for 90-degree turns. Do not break even with the bend right at the base of the LED. Bright enough to show through translucent plastic without being overwhelmingly bright. So far, have not had any batteries run down (I am using CR2032 batteries) Cons: None that I have encountered. ... show more
Reviewed in the United States on November 1, 2019 by Forest B.

  • Read carefully
Style: [B] 5mm Constant Light Color: [02] 10 Colors X 20 Pcs / 200pcs
That colored picture applies only when the LEDs are lit. They are all clear, so you cannot tell them apart if you mix them up. They also have different voltage ratings depending on the LED color, so you have to take that into account for each one.
Reviewed in the United States on February 16, 2019 by Murray Hertz

  • Resistors not included
Style: [B] 5mm Constant Light Color: [14] Red&Green (Common Cathode) / 10...
Add stated product included 100 leds and 200 resistors. Resistors were not included in the package. UPDATE: I was contacted by the supplier who apologized for the error and wanted to correct the problem. Based on their customer service and their desire to correct the problem, I am changing my rating to four stars. ... show more
Reviewed in the United States on October 17, 2018 by WayneS

  • colored 200 piece LED lights
Style: [A] 3mm Constant Light Color: [02] 10 Colors X 20 Pcs / 200pcs
these are bright many different colors easy to work with just remember to use the resister that comes with each led or it will get to much power from your power source and blow the led out. It does not take much power to get theses turned on plus they are very bright its a win win with this kit plus very affordable. I'm using them for all of my RC kits planes, RC submarines, cars ,trucks, you name it. would buy it again ... show more
Reviewed in the United States on January 26, 2019 by James

  • Perfect for Changing Interior Lights in my 08' Ram 1500
Style: [A] 3mm Constant Light Color: [02] 10 Colors X 20 Pcs / 200pcs
I bought this LED kit to replace the burnt out bulbs in my OEM switches, and change the color from the boring green to a cool blue ( I re-used the original rubber blue bulb covers with white LED's). Resistors are needed for 12V systems otherwise you just burn out LED's. I couldn't be happier how it turned out. ... show more
Reviewed in the United States on May 16, 2019 by K. Wilks

  • Not good for “black light” effect - you want 365nm
Style: [B] 5mm Constant Light Color: [11] Purple (Uv) / 100pcs
I got these hoping for some cool black light effects. They are fine LEDs, I just did not pay close attention when I got them. If you are looking for a more “ghostly white purple” these are for you. They do activate fluorescents, and glow in the dark pigments, but not as well as would be hoped. Because they are closer to invisible light (UV), they do not impress much when on, (at 2.85 volts). The reality is, they are working, but you can’t see them well. I have been driving some at 4volts DC, (without the resistor) and they are a bit more impressive. I may be overdriving them, and it may shorten their lifespan, but they seem to be doing okay, and I am really not happy I got these. The leds in the skull photo are on a DC power supply, metered at 2.85 volts. I hope that helps any fellow Halloweeners! ... show more
Reviewed in the United States on October 2, 2021 by Dirk Lonestar

Can't find a product?

Find it on Amazon first, then paste the link below.
Checking for best price...